> News >

Mobile gantry cranes during the running-in period

Jan 08, 2019
In recent years, the application scope of mobile gantry cranes has become more and more extensive. In order to better work and better extend the working life, the running-in period of mobile gantry cranes is a very important stage.
 
First, the haracters of running-in period
1. The parts wear fast
2. The leakage of oil or water occurs in the mobile gantry crane
3. The parts of mobile gantry crane occur loose
4. Poor lubrication between mobile gantry crane parts
 
Second, use and maintenance of the running-in period
1. The operator should be trained to have a good understanding of the mobile gantry crane structure, performance, operation and maintenance.
2. Keep the mobile gantry crane clean, adjust and tighten the loose parts in time.
3. The working load during the running-in period should not exceed 80% of the rated working load.
4. Check the oil level and quality of lubricating oil, add oil to the lubrication point.
5. Always observe the instructions of mobile gantry cranes, if the indicate has some abnormality, stop the operation and eliminate it in time.
6. When the mobile gantry crane running-in period is over, the whole crane should be forcibly maintained.
 
Double girder gantry crane
double girder gantry crane


Single girder gantry crane
single girder gantry crane
Top