Gantry crane used to vertically move horizontally or vertically and heavy mechanical and electrical equipment, including lifting mechanism, running institutions, luffing and slewing mechanism and metal structures,. General requirements for gantry crane installation erected as follows:

Before gantry crane installation erected, to fully grasp the performance and features of the tower gantry crane, understanding set out in the manual installation order and method of erection, and strictly adhered to.

When installing the erection, pay attention to the wind speed, wind speed must satisfy the design requirements, generally not exceeding 13m/s.



All parts are properly connected and reliable.
When installing the erection, to observe, monitor, unity of command, liaison and reliable.
Lifting equipment and lifting slings must be strictly checked before use.
Follow wire rope use and installation requirements, cannot produce hard, cage-bending distortion, loose broken wires bare core unit, and so on. Special multilayer non-rotating wire rope, to the packaging of the rollers around directly into the drum if necessary cut off, be sure to use without having to cut multiple wire rope fastening cut at both ends to prevent loose.
Components must be installed in strict accordance with the design requirements, they must not be arbitrary cancellation, substitution and added, any change should come through professional and technical personnel before they can execute.




After the installation is set up, must be properly inspected.
Scrupulous respect for manual lifting equipment, lifting capacity of the gantry crane parts quality, location, dimensions, lifting the center of gravity height requirements.
Before lifting, after careful inspection of lifting equipment, lifting and rigging, load test should be carried out and confirmed safe.